* A Mobile Offshore Production Unit (MOPU) with process
capabilities of 50,000BOPD, 25,000BWPD and 60MMCFG/D
* 4 Waukesha compressors of 2500 HP each to handle over 100MMCFG/D. Used primarily for gas re-injection to maintain reservoir pressure thereby reducing gas flaring. * Offshore Transport Pipelines connected to a Single Point
Buoy Mooring
System * HP Flare Stack plus a 16’ OD Flare Line. * A 1,000,000 bbls Floating Storage & Offloading Unit (FSO). * A 17km, 12'' Subsea Pipeline. * A Terminal (Amni operates and maintains her own Terminal, the IMA Terminal to minimise interruption in her operational activities). *
Well Head Platform * Production flowlines *
Gas lift flowline *
Floating production storage off take vessel, with 200,000bbl capacity
Production has been centered around 10 exploration, appraisal and development wells in the IMA Field. These wells were successfully drilled between June 1994 and December 1997. Daily average production reached a peak of 27, 000 bopd in June 1997 and has gradually declined to the current level of 2, 500 bopd due to dwindling reservoir pressure. |
|||||